← Field guides

Supplier quotes and delivery

How do gravel delivery minimums affect the quote?

A delivery minimum can affect the amount you pay, the amount the truck brings, or both. Ask which applies before comparing suppliers.

A residential gravel delivery by dump truck

How to work it out

Separate the material rate from the transport fee. A minimum billable weight sets a floor under the material charge. An order minimum may force you to receive more gravel than the project needs. Ask about the load increment too, since rounding can move the invoice above either number.

Worked example

At USD 38 per US ton and USD 85 delivery, a 5-ton load is USD 275 before tax. If billing has a 6-ton minimum, the quote becomes USD 313. If the supplier also delivers six tons, plan where the spare ton goes.

Does a 6-ton minimum mean six tons arrive?

Ask the supplier. A billing floor can differ from the amount loaded.

Before placing the order

Request the delivered quantity and billable quantity in writing.

Reference Bellhouse gravel delivery and load planning.

Continue planning

Open the gravel driveway calculator →